Workforce planning challenge

by Siemens AG, Power Generation Services

Improved workforce planning of employees of external suppliers (temp labor).

Keywords: Software; app; process; Analysis; personal planning; external suppliers; availability/qualification check

Not all construction sites can be handled with in-house staff. Therefore, it is
necessary that Siemens orders temporary labor. The Field Service works together with different suppliers, the provided employees are registered to a pool, Siemens can order from. At the moment, the dispatcher determines needs and the eternal suppliers are asked for suitable staff. Suitable means:
• is the employee available?
• does the employee have the required qualification?
• does the employee have the required certificates?
If suitable temp labor workers are found, they will be ordered and dispatched.

Siemens AG, Power Generation Services

The Siemens Power Generation Services Division offers a broad spectrum of innovative products and services, to enable our customers within the utility, oil & gas, and industrial processing industries to achieve high reliability and optimal performance of their rotating power equipment. In addition to our conventional services we offer Digital Services that enable customers to create new business models and manage their risk, improve their performance and ultimately increase their profitability.

Other Challenges:

Field Service Communication app challenge

Keywords:
Software; app; smartphone; process; Analysis; image recognition; collaboration tool; project management software

Dynamic planning simulation challenge

Keywords:
Production Planning; Visualization; Dynamic scheduling; Shopfloor Management; SAP APO; manufacturing control; load balancing

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore

TALK TO US!

You need more information about the RuhrSummit?

phone: +49 201.879 193 90 | mail: info(at)summit.ruhr